Bodyline (Pvt) Ltd • Horana Plant 1

CDMS +

Cutting Department Management System

85 Staff Profiles Loaded 16 Pattern Blocks & 3D Molds 5-Min Procedure Idle Protection

Digital Pattern Room Catalog

General Floor Terminal • Admin Controls Stripped • Scan QR to Borrow or Return Pattern Blocks & 3D Molds

Cutting Supervisor & Executive Command

Roles: Cutting Senior Exec (CSE-01) & Line Supervisors (CS-L1-01, CS-L2-01, CS-L3-01)

15-Min Lock Clearance Queue 0

Active Floor Deployments 0

Floor Operator Pool (Tap to Lock) None Locked

7-Day Shift Deployment Matrix (Tap Any Shift Slot to Assign Locked Operator)

Scheduled workers bypass the 15-minute mutex lock during QR checkout.

Active Week: Oct 26 – Nov 01, 2026

Design, CAD Room & Pattern Tooling Hub

Roles: Design Coord (DDC-C) • CAD Coord & Marker Makers (CADC-C, CAD-C-MM, CAD-C-CPH) • Pattern Room (PR-C-PC, PR-C-PH)

1. Design Dept: Style, Fabric & Brand Request

Design Direct Action: Add New Cloth Fabric Type

Missing Brand / Parameter? Send Request to Admin

2. Pattern Room: Register Block/Mold & Print QR

6-Month Inactive / Pending Removal Alert

3. CAD Tooling Request (Cardboard & Plastic)

CAD Pattern Handlers (CAD-C-CPH) request raw Kraft Cardboard (`MAT-CRD-01`) or Thermo-Plastic (`MAT-PLS-01`) from RMW to fabricate blocks/molds.

Active Styles & CAD Markers (16 Loaded)

Sewing Requisitions & RMW Material Dispatch

Roles: Sewing Dept Coordinators (SDC-C-01..03) & Raw Material Warehouse Coordinators (RMWC-C-01..03)

Sewing Dept: Submit Batch Cutting Order

RMW Warehouse: Cardboard, Plastic & Fabric Dispatch

Dispatch `MAT-CRD-01` / `MAT-PLS-01` to CAD Room, or dispatch `FAB-XX` cloth rolls to Cutting Floor Spreaders (`Line 1`, `Line 2`, `Line 3`).

Floor Quality Control (QC) Defect & Re-Cut Center

Roles: QC Executive (CQCE-01) & Floor QC Inspectors (QCI-C-01, QCI-C-02, QCI-C-03)

Flag Pattern/Mold Defect or Request Line Re-Cut

Active QC Defect Logs, Locked Molds & Re-Cut Requests Assigned Resolvers Can Mark Resolved

Higher-Up Executive Oversight & Live Inter-Department Request Stream

Real-Time Visibility for Cutting Dept Head (DH-01), Senior Executive (CSE-01) & Digital Team (CDTE-01)

Total Blocks & Molds

16

Available in Room

0

Active on Lines

0

QC Flagged / Dormant

0

Open Dept Requests

0

Add System Dropdown Parameter

Incoming Parameter Requests (From Design/CAD)

Active System Parameters

    Grouped Management Reports & Visual Database Explorer

    Grouped Management Reports (Chapter 4.4) + Live 10-Table Visual Database & File Design Viewer (Chapter 4.3)